• Price/Package: US $8.65 Your Prices
  • Download APP to save EXTRA US $10.
  • Bronze Price:

    US $8.39

    3%off
  • Silver Price:

    US $8.13

    6%off
  • Gold Price:

    US $7.87

    9%off
  • Platinum Price:

    US $7.61

    12%off
  • Diamond Price:

    US $7.35

    15%off
  • 8 Days
    Weight: 1,150(g)
  • Shipping Time:
  • Request More Product Information

    Request More Product Information

    Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Teal, 23x8~9mm, Hole: 3mm; about 2000pcs/1000g(WOOD-Q003-23x8mm-05-LF)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Teal, 23x8~9mm, Hole: 3mm; about 2000pcs/1000g(WOOD-Q003-23x8mm-05-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Teal, 23x8~9mm, Hole: 3mm; about 2000pcs/1000g(WOOD-Q003-23x8mm-05-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

  • Please visit PandaWhole, cheapest price waits for you. PandaWhole MOQ: 5 Packages = 1000g * 5 = 5000g
  • Coupon: US $5.00 for NEW Client. Register Now >>

Specification Size Info

Size 23x8~9mm, Hole: 3mm; about 2000pcs/1000g
Material Wood
Color Teal
Shape Oval
Usage Beads
Package Size 1,000 g per package

Description:

Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Teal

Size: about 23mm long, 8~9mm wide, Hole: 3mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note: The color may be slightly different from the picture because of different display device.

Customer Images See all 1 photos , or upload yours and get Cash Coupon

Hot Wish Lists Which Contain This Item

Confirm

Please Note

OK
Country/Region:

Search by Image

·Search pandahall with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png
    2. The size of the image should be less than 2M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png
    2. The size of the image should be less than 2M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File