• Add to Wish List (34 Likes)

    • Color:

    • Package Size:

    • Options:

    • Specification:
      Size 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g
      Material Maple Wood
      Color Light Yellow
      Shape Oval
      Usage Beads
      Package Size 1,000 g per package
      Color Treatment Dyed

  • Availability:
    IN STOCK

  • 2-3 Working Days

    1,000(g)

    I Want Smaller Lots

    Ask a Question

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

  • Promotion:
    Coupon: US $53.00 for NEW Client. Register Now >>
    Member Discounts Up to 20% OFF
    • Bronze Price: US $7.97 3%off
    • Silver Price: US $7.72 6%off
    • Gold Price: US $7.48 9%off
    • Platinum Price: US $7.23 12%off
    • Diamond Price: US $6.98 15%off
    • Super Price: US $6.57 20%off
    Lower Price at PandaWhole

    Please visit PandaWhole, cheapest price waits for you. PandaWhole MOQ: 10 Packages = 1000g * 10 = 10000g

Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow

Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note: Slight deviations in colors is allowed due to different display device.

Featured Reviews

Customer Questions

Confirm

close

Please Note

OK
Country/Region:

Search by Image

·Search pandahall with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File